RP Update 50 Posted byadmin September 7, 2020September 14, 2020 Leave a comment on RP Update 50 Stones are being poured into the site, they will be under the P4 SlabDrains under the building its being installed. Continuing to pour outside walls Steel work on the Elevator shaft is continuing