Completed perimeter foundation wall. Completed all upright columns for the foundation. Decking is up on the south side of the site in preparation for P3. Continuing the pour for P4 slab.
Category Archives: Redpath
RP Update 52
Formwork continues for the Elevator Shaft The south part of the P4 slab has been poured Continuing to pour the outside walls Stone is being used to fill below the P4 slab Drainage on the north part of the site is being placed.
RP Update 51
Continuing to pour the outside walls. Steel work continues on the elevator shaft Preparing to pour P4 Slab
RP Update 50
Stones are being poured into the site, they will be under the P4 Slab Drains under the building its being installed. Continuing to pour outside walls Steel work on the Elevator shaft is continuing
Rp Update 49
Crane Pad is being poured. Preparation for crane to be erected. Steel being laid for foundation walls. Continuing to p0ur columns.
RP Update 49
Steel for Crane Pad is ready Crane Pad to be poured Crane to be erected
RP Update 48
Water Proofing being completed for the crane pad. Pouring columns Preparing Steel for the Crane Pad
RP Update 47
Water Proofing being completed on the lowest level. Steel being tied on the walls. Setting up for pouring columns
RP Update 46
Excavation has been completed.
RP Update 45
We are now one week away from completing our excavation. Waterproofing of the site has now begun and will continue for the 3 – 4 months, Construction of footings has now also begun, along with the early stages of the building foundation.