293 Kingsway Condo Update The parking levels are now complete. The Ground floor walls and columns are in place and 50% of the deck on the ground floor is also complete. The Kingsway Rentals Kingsway Rental Building A ground floor is complete and the 2nd floor deck is to be poured next week. Concrete for […]
Category Archives: Kingsway
293 Kingsway Condos
293 Kingsway Condo Update We have completed the concrete construction for levels 2 and 3 in the parking garage. The P1 garage level is scheduled to be completed by the end of July. We are currently pouring the columns and walls for the ground floor of the project.
Kingsway Update 11
Condo Temporary ramp to be completed. Crane Pad to be dug Continuing to haul out spoils Rental Beginning underground drainage for Building B Pouring Elevator and Stair Pad for Building B Building A Stair Pad and Elevator to be dug out.
Kingsway Update 10
Condo Continuing to haul out soil. Crane Pad to be installed in preparation. Rentals Continuing concrete footings and columns for Building A. The Crane for Building A has been Erected. Beginning underground drains on building B. Digging elevator footing on Building B.
Kingsway Update 9
Condo Beginning to dismantle dewatering system Continuing the cut to sub grade Rental Beginning backfill at interior footings on Building B Starting to pour footings for Building A Begging underground drain preparation for Building B Crane for Building A to be operational
RP Update 57
P3 pour continuing on site Working on exterior wall water proofing Continuing to lay steel for the completion of P3
Kingsway Update 8
Condo Lagging has Been Completed Soil Being Hauled out by Roni Rentals Building A Crane Pad to be poured Building A Dewatering set to be dismantled Concrete footings and columns underway at Building B
Kingsway Update 7
293 The Kingsway ProgressVertical shoring is completeTieback installation has started Site excavation continues. Add pics of these items crop and size photos Rental Building progressVertical Shoring and Tieback installation for the 2 rental buildings is complete. Concrete footings will be poured at the basement level during the week of September 14th. Reinforcing steel for the basement foundation […]
Kingsway Update 6
Condo Excavation Continues Dewatering system install Lagging Underway Rentals Shoring is continuing Tiebacks have been completed Stressing of tiebacks to begin Bulking 118 elevation to continue
Kingsway Update 5
Drilling for our shoring system continues as scheduled. We continue to maintain a clean and safe worksite, including safe washroom facilities, and to stress safe work practices for our construction tradesmen.