Continuing to pour the outside walls. Steel work continues on the elevator shaft Preparing to pour P4 Slab
Author Archives: admin
RP Update 50
Stones are being poured into the site, they will be under the P4 Slab Drains under the building its being installed. Continuing to pour outside walls Steel work on the Elevator shaft is continuing
Kingsway Update 6
Condo Excavation Continues Dewatering system install Lagging Underway Rentals Shoring is continuing Tiebacks have been completed Stressing of tiebacks to begin Bulking 118 elevation to continue
Rp Update 49
Crane Pad is being poured. Preparation for crane to be erected. Steel being laid for foundation walls. Continuing to p0ur columns.
RP Update 49
Steel for Crane Pad is ready Crane Pad to be poured Crane to be erected
RP Update 48
Water Proofing being completed for the crane pad. Pouring columns Preparing Steel for the Crane Pad
RP Update 47
Water Proofing being completed on the lowest level. Steel being tied on the walls. Setting up for pouring columns
RP Update 46
Excavation has been completed.
RP Update 1
We will be beginning our demolition on September 23, 2019 We will be demolishing for approximately four weeks during which time the site will be fenced off for safety Dust mitigation and traffic control plans will be enforced