RP Update 41 Posted bychris June 22, 2020June 29, 2020 Leave a comment on RP Update 41 Excavation and shoring continue as scheduled.Additional traffic control personnel have been brought onsite to ensure the safe and orderly flow of trucks in and out of the site.