Completed perimeter foundation wall. Completed all upright columns for the foundation. Decking is up on the south side of the site in preparation for P3. Continuing the pour for P4 slab.
Monthly Archives: September 2020
RP Update 52
Formwork continues for the Elevator Shaft The south part of the P4 slab has been poured Continuing to pour the outside walls Stone is being used to fill below the P4 slab Drainage on the north part of the site is being placed.
Kingsway Update 7
293 The Kingsway ProgressVertical shoring is completeTieback installation has started Site excavation continues. Add pics of these items crop and size photos Rental Building progressVertical Shoring and Tieback installation for the 2 rental buildings is complete. Concrete footings will be poured at the basement level during the week of September 14th. Reinforcing steel for the basement foundation […]
RP Update 51
Continuing to pour the outside walls. Steel work continues on the elevator shaft Preparing to pour P4 Slab
RP Update 50
Stones are being poured into the site, they will be under the P4 Slab Drains under the building its being installed. Continuing to pour outside walls Steel work on the Elevator shaft is continuing